619 Memorial Hwy, Bismarck, ND 58504 Mon–Fri 8:00 am – 4:00 pm

A finished lower level and downstairs shower in Dickinson

Dickinson, ND · 2025 · Basement finishing · custom tile shower. The homeowner’s task: Finish the basement living space and build a shower in the downstairs bathroom.

  • Drywall, recessed lighting, flooring and trim
  • Tile shower with niche shelving
  • Frameless glass enclosure
Finished lower level with the bathroom entry

What HHI did

HHI finished the basement living space with drywall, recessed lighting, flooring and trim. In the downstairs bathroom, the crew built a tile shower with niche shelving and a frameless glass enclosure.

  • Drywall, recessed lighting, flooring and trim
  • Tile shower with niche shelving
  • Frameless glass enclosure
Open finished lower level with a dining area and recessed lights
Open finished lower level with a dining area and recessed lights
Tile shower with a niche and frameless glass
Tile shower with a niche and frameless glass

Before & after

Drag the handle to compare before and after.

After: Finished lower level
Before: Finished lower level
BeforeAfter
Finished lower level

Planning something similar?

Takes about a minute. Our office follows up during business hours; Viktor confirms the visit and the written scope.

Viktor with two HHI crew members

Viktor, your general contractor, coordinates your estimate

  • Our office follows up during business hours
  • Free in-home consultation in Bismarck–Mandan
  • Written estimate before any work starts

(701) 329-9659

Call Free estimate